HomeBranchesIrrigation BranchFlood control and water control

Flood control and water control

 
This office has dewatering pump sets as detailed below. These pumps are used during heavy rainfall.
Sr. No. Office in charge No. of pump sets Capacity
1. Deputy Executive Engineer M.I.P. sub Div Anand 4 6.50 HP
2. Deputy Executive Engineer M.I.P. sub Div Khambhat 6 6.50 HP
 

Last Update : 11/2/2014

Visitors : 429243